How long a bathroom takes — Bathroom Renovations Galway
Day by day, from the strip-out to the last bead of silicone, and the wait before day one.
Free, no obligation. One local company prices it, not five.
- 7 to 12 daysfor a standard bathroom
- About a weeka small refresh
- 10 to 14 daysa wet room
- 1 to 2 weeksfor tiles that have to be ordered in

How long a bathroom takes: the short answer
A standard bathroom renovation in Galway takes 7 to 12 working days from the strip-out to the final clean. Wet rooms take longer, because the floor has to be laid to a fall and the tanking left to cure.
The stages, in order
| Stage | Days |
|---|---|
| Strip-out and skip | 1 |
| Plumbing first fix | 1 to 2 |
| Boarding and tanking, then drying | 1 to 2 |
| Tiling | 2 to 3 |
| Second fix and finishing | 2 to 3 |
| Total, working days | 7 to 12 |
Tanking and screed have to dry before tiling. That's where days slip.
The weeks before it starts
- Pick and order the tiles and the suite first. Tiles that have to be ordered in can take one to two weeks.
- A made-to-measure shower screen or vanity can take longer. Order it at the start.
- A grant job waits for the council's approval before anything starts.
Living with one bathroom
The room is out of use for the whole job. Ask whether the toilet can go back in at the end of each day, and for how many days there'll be no shower.
Get a price for your bathroom in 4 taps
Tap what you need and leave your number. It goes to one bathroom renovation company that covers your part of Galway, and they ring you back to see the room and give you a written price.
More from the guide
Bathroom renovation guides & price breakdowns
Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.
More guides & resources: All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site
Questions people ask us
How long does a bathroom renovation take in Galway?
7 to 12 working days for a standard bathroom.
How long does the tiling take?
Two to three days in a standard bathroom, after the tanking has dried.
What makes it take longer?
Moving the toilet or shower, a wet room floor, drying times, and tiles or a vanity that haven't arrived.
Can I use the bathroom during the work?
No. It's out of use for the whole job. If it's your only one, ask how the toilet will work overnight and plan showers elsewhere.
Bathroom renovation across Co. Galway
One local company covers Co. Galway — including Galway City, Salthill, Ballinasloe, Knocknacarra, Oranmore and every surrounding town and suburb. Pick your area below for local prices, specifications and advice. Compare all areas covered →

Get a free price for your bathroom in Galway
Four taps, or a photo. One local company rings you with a written price.
